KTM Owners Forum banner

1 - 1 of 1 Posts

·
Registered
Joined
·
316 Posts
Discussion Starter #1
I'm almost done installing grease nipples on the 690, done the head stock nipple in the bottom cap and a small hole drilled in the stem.
Pro lever linkage done drilled two hole on the centre of the casting for each bearing and one on the tie link to the frame.
The only thing I have left to do is the swing arm, right hand side is easy in the top middle of bearings, but the left has the chain runnig round it wondered if any body had already done this and had a solution?
Thanks in advance, Noel.
 
1 - 1 of 1 Posts
Top